Glenoaks Christian School Block Wall Replacement - San Fernando, CA
The San Fernando block wall replacement project involved the demolition and reconstruction of a 150-linear-foot wall that had become a safety hazard due to its unstable structure and lack of rebar reinforcement. The new wall was built with modern, high-quality CMUs (concrete masonry units) and proper engineering standards, including a reinforced foundation and integrated rebar to ensure long-term stability and safety.
Project Highlights
REINFORCED STABILITY
The new block wall is significantly more stable and durable, with rebar reinforcement throughout, addressing the critical safety issues presented by the old wall.
COMPREHENSIVE SAFETY COMPLIANCE
VERITAS replaced a hazardous structure with a secure, code-compliant wall, significantly reducing the risk of future collapse or damage – especially important when little children are in close proximity.
AESTHETIC IMPROVEMENT
The new wall not only serves its structural purpose but also enhances the property’s overall appearance with a neat and professional finish. No leaky mortar or uneven blocks here!
LONGEVITY
With a reinforced foundation and proper construction techniques, the new block wall is designed to stand the test of time, providing long-term security and peace of mind for the elementary school and the adjacent residence.
Scope of Work
Site Preparation & Demolition
- Cleared and secured the work area to ensure safety during demolition.
- Handled all the necessary drafting and submitted permits to the local Building & Safety office, ensuring the project complied with all local regulations and standards.
- Removed the old block wall, focusing on safely demolishing the collapsed sections and areas prone to failure.
- Disposed of all debris from the old wall according to local regulations.
Excavation & Foundation Prep
- Excavated trenches for the new wall’s foundation, ensuring the base was properly prepared.
- Poured a reinforced concrete footing, including horizontal rebar, to provide a stable foundation.
Rebar Installation
- Installed vertical and horizontal rebar throughout the length of the wall, ensuring the wall was properly reinforced at every level.
- Tied rebar securely and ensured that it was placed according to engineering specifications to maximize structural integrity.
Block Wall Construction
- Installed vertical and horizontal rebar throughout the length of the wall, ensuring the wall was properly reinforced at every level.
- Tied rebar securely and ensured that it was placed according to engineering specifications to maximize structural integrity.
Final Touches & Inspection
- Applied necessary surface finishes, such as waterproofing, to protect the wall from the elements.
- Cleaned the worksite thoroughly, removing all construction debris and leaving the area in a clean state.
- Conducted a final inspection to ensure the wall met all structural and safety standards.